930 AXLES

Up BUILD TEAM TEAM THANKS CHASSIS ENGINE CAGE SEATS CONTROLS CONSOLE SIGNALS FLOOR PARTS PARTS 2 FRONT END STEERING BRAKES SPINDLES MOTOR 1 MOTOR 2 930 ADAPTER 930 AXLES DRIVETRAIN REAREND SHOCKS ELECTRIC 1 ELECTRIC 2 UPDATE 4-16 UPDATE 5-2 UPDATE 5-24 UPDATE 6-6 UPDATE 6-12 TEST DRIVE I MRC PAINT PAINT I REASSEMBLY I REASSEMBLY II AUGUST 26 TEST DRIVE II IN THE FIELD FIELD TEST PRICELESS


OUTER SIDE


FLANGE SIDE


930 Lobro CV Joints

Assembly order in
order from
inner to outer CV

  • C-clip

  • CV bevel side out
    (groove side to the flange)

  • CV flange

  • CV boot

  • CV boot

  • CV flange

  • CV bevel side out

  • C-clip


Partially greased CV


Plexiglas grease apparatus

Installed axle pictures
axle range of motion tba tba

 

 Page maintained by MRC    Last modified 07/21/2010